New Home Construction Budget3/7/2023
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1ZONING6/7/20238/9/202303680000
7
1.1Land Use6/7/20238/8/2023036000OpenMedium00
8
1.2Easements, Set Backs6/10/20238/9/2023036000OpenMedium00
9
1.3Access, Street Improvements6/10/20238/9/2023036000OpenMedium00
10
1.4Utilities Available6/10/20238/9/2023036000OpenMedium00
11
2HOUSE PLANS8/12/202310/16/202303840000
12
2.1Purchase Standard Plans8/12/202310/11/2023036000OpenMedium00
13
2.2Architect Original Drawings8/13/202310/14/2023036000OpenMedium00
14
2.3Specifications8/14/202310/15/2023036000OpenMedium00
15
2.4Architect Manage Job8/15/202310/16/2023036000OpenMedium00
16
2.5Engineer-Loads & Spans8/15/202310/16/2023036000OpenMedium00
17
2.6Draftsman8/15/202310/16/2023036000OpenMedium00
18
3LOT SURVEY10/17/202312/23/202303840000
19
3.1House & Driveway10/17/202312/18/2023036000OpenMedium00
20
3.2Well Locaton10/18/202312/19/2023036000OpenMedium00
21
3.3Septic Location10/21/202312/20/2023036000OpenMedium00
22
3.4Fire Hydrant & Truck Access10/22/202312/23/2023036000OpenMedium00
23
3.5Plot Plan10/22/202312/23/2023036000OpenMedium00
24
4FINANCIAL - LOAN12/24/20232/27/202403840000
25
4.1Land Cost12/24/20232/24/2024036000OpenMedium00
26
4.2Interest on Land12/25/20232/25/2024036000OpenMedium00
27
4.3Interest on Const. Loan12/26/20232/26/2024036000OpenMedium00
28
4.4Points, Etc.12/27/20232/27/2024036000OpenMedium00
29
5SEWER & WATER HOOKUP7/1/20238/30/2023036000OpenMedium00
30
6HEALTH PERMIT7/1/20239/3/202303760000
31
6.1Fees7/1/20238/30/2023036000OpenMedium00
32
6.2Percolation Test7/2/20239/2/2023036000OpenMedium00
33
6.3Soils Engineer7/3/20239/3/2023036000OpenMedium00
34
7INSURANCE7/4/20239/4/2023036000OpenMedium00
35
8LOT CLOSING COSTS7/5/20239/5/2023036000OpenMedium00
36
9BUILDING PERMITS7/8/20239/6/202303600000
37
9.1Fees7/8/20239/6/2023036000OpenMedium00
38
9.2Inspection Schedule7/8/20239/6/2023036000OpenMedium00
39
10PRELIMINARY LIST ONLY7/9/20239/9/2023036000OpenMedium00
40
11BUILD PHASE7/10/20239/10/2023036000OpenMedium00
41
12SPECIAL & DRY IN MATERIALS7/12/20239/13/202303680000
42
12.1Rough Hardware, Misc.7/12/20239/12/2023036000OpenMedium00
43
12.2Lolly Columns7/15/20239/13/2023036000OpenMedium00
44
12.3Steel Beams7/15/20239/13/2023036000OpenMedium00
45
12.4Rough Lumber, Trusses7/15/20239/13/2023036000OpenMedium00
46
13WINDOWS/OPENINGS7/17/20239/19/202303760000
47
13.1Windows, Grills, Screens7/17/20239/17/2023036000OpenMedium00
48
13.2Exterior Doors,Screens7/18/20239/18/2023036000OpenMedium00
49
13.3Skylights and Light Tubes7/19/20239/19/2023036000OpenMedium00
50
14DEMOLITION7/22/20239/20/2023036000OpenMedium00
51
15LOT CLEARING7/22/20239/24/202303760000
52
15.1Debris Removal & Clearing7/22/20239/20/2023036000OpenMedium00
53
15.2Dump Fee7/23/20239/23/2023036000OpenMedium00
54
15.3Bury Stumps, etc.7/24/20239/24/2023036000OpenMedium00
55
16DRIVEWAY, rough7/26/20239/27/202303680000
56
16.1Grade7/26/20239/26/2023036000OpenMedium00
57
16.2Base Rock, Culverts7/29/20239/27/2023036000OpenMedium00
58
17UTILITIES7/29/20239/30/202303680000
59
17.1Temporary at startup7/29/20239/27/2023036000OpenMedium00
60
17.2Transfer to permanent7/30/20239/30/2023036000OpenMedium00
61
18WELL or PUBLIC WATER7/31/202310/1/2023036000OpenMedium00
62
19SEPTIC or PUBLIC SEWER8/1/202310/2/2023036000OpenMedium00
63
20LAYOUT HOUSE FOOTPRINT8/5/202310/4/202303600000
64
20.1Establish Finish Floor Height8/5/202310/4/2023036000OpenMedium00
65
20.2Set Back Distances8/5/202310/4/2023036000OpenMedium00
66
21DIG FOUNDATION8/5/202310/4/2023036000OpenMedium00
67
22ROCK PROBLEM8/6/202310/7/2023036000OpenMedium00
68
23PREPARE FOR FOOTINGS8/8/202310/10/202303680000
69
23.1Lay out and excavate8/8/202310/9/2023036000OpenMedium00
70
23.2Form, Rebar, Grade Pegs8/9/202310/10/2023036000OpenMedium00
71
24POUR FOOTINGS & PADS8/12/202310/11/202303600000
72
24.1Yds. of Concrete8/12/202310/11/2023036000OpenMedium00
73
25SET BRICK POINTS8/12/202310/11/2023036000OpenMedium00
74
26TERMITE TREATMENT8/13/202310/14/2023036000OpenMedium00
75
27RADON CONTROL8/14/202310/15/2023036000OpenMedium00
76
28FOUNDATION WALLS8/16/202310/22/202303840000
77
28.1Block/Course8/16/202310/17/2023036000OpenMedium00
78
28.2Piers8/19/202310/18/2023036000OpenMedium00
79
28.3Pour Wall, Yds. Of Concrete8/19/202310/18/2023036000OpenMedium00
80
28.4Lintels, Rebar8/19/202310/18/2023036000OpenMedium00
81
28.5Parging8/20/202310/21/2023036000OpenMedium00
82
28.6Cement, Sand, etc.8/21/202310/22/2023036000OpenMedium00
83
29WATERPROOF FOUNDATION.8/22/202310/23/2023036000OpenMedium00
84
30COLUMNS/BEAMS SET8/23/202310/24/2023036000OpenMedium00
85
31UNDERGROUND PLUMBING8/26/202310/25/2023036000OpenMedium00
86
32BRICK/STONE, to finish grade8/26/202310/25/2023036000OpenMedium00
87
33GARAGE DOORS8/27/202310/29/202303680000
88
33.1Openers8/27/202310/28/2023036000OpenMedium00
89
33.2Trim, Backing, Weatherstrip8/28/202310/29/2023036000OpenMedium00
90
34DRAIN TILE8/29/202310/30/2023036000OpenMedium00
91
35FIRE PLACE - INTERIOR9/2/202311/1/202303600000
92
35.1Pour Hearth9/2/202311/1/2023036000OpenMedium00
93
35.2Firebox, or Set Prefab9/2/202311/1/2023036000OpenMedium00
94
35.3Brick or Stone Facing9/2/202311/1/2023036000OpenMedium00
95
36PREPARE CONC. SLABS ETC.9/4/202311/8/202303840000
96
36.1Gravel, Wire, Poly, Grade Stakes9/4/202311/5/2023036000OpenMedium00
97
36.2Labor to Prepare for Slab9/5/202311/6/2023036000OpenMedium00
98
36.3Rebar, Wire, form boards9/6/202311/7/2023036000OpenMedium00
99
36.4
Labor-Prepare, Form other Conc.
9/9/202311/8/2023036000OpenMedium00
100
36.5
Deck & Post Hole footings, etc.
9/9/202311/8/2023036000OpenMedium00