Commercial Construction Budget3/7/2023
5
Color
WBS Number
Task name / TitleAssigned to
Planned start date
Planned end date
Deadline
Progress (%)
Duration (hours)
Estimated hours
Time log (minutes)
StatusPriority
Task description
Cost
Actual cost
6
1GENERAL REQUIREMENTS4/6/20236/15/202304080000
7
1.1Plans & Specifications4/6/20236/7/2023036000OpenMedium00
8
1.2Plan Review4/9/20236/8/2023036000OpenMedium00
9
1.3
Permits: Zoning, Building, Environemental
4/9/20236/8/2023036000OpenMedium00
10
1.4Survey4/9/20236/8/2023036000OpenMedium00
11
1.5Impact Fee4/10/20236/11/2023036000OpenMedium00
12
1.6Adminstrative Costs4/11/20236/12/2023036000OpenMedium00
13
1.7Financing Costs4/12/20236/13/2023036000OpenMedium00
14
1.8Legal Fees4/13/20236/14/2023036000OpenMedium00
15
1.9Engineering Fees4/16/20236/15/2023036000OpenMedium00
16
1.10Other4/16/20236/15/2023036000OpenMedium00
17
2SITE PREP4/17/20236/29/202304320000
18
2.1Demolition (Remodel)4/17/20236/18/2023036000OpenMedium00
19
2.2Jacking & Shoring (Remodel)4/18/20236/19/2023036000OpenMedium00
20
2.3
Dust control, Surface Protection
4/19/20236/20/2023036000OpenMedium00
21
2.4Job-Site Access4/20/20236/21/2023036000OpenMedium00
22
2.5Job-Site Security4/23/20236/22/2023036000OpenMedium00
23
2.6Dumpster & Removal4/23/20236/22/2023036000OpenMedium00
24
2.7Clear Lot4/23/20236/22/2023036000OpenMedium00
25
2.8Storage On Site4/24/20236/25/2023036000OpenMedium00
26
2.9Portable Toilet4/25/20236/26/2023036000OpenMedium00
27
2.10Temporary Power4/26/20236/27/2023036000OpenMedium00
28
2.11Temporary Heat4/27/20236/28/2023036000OpenMedium00
29
2.12Scaffolding Rental4/30/20236/29/2023036000OpenMedium00
30
2.13Tool/Equipment Rental4/30/20236/29/2023036000OpenMedium00
31
2.14Other4/30/20236/29/2023036000OpenMedium00
32
3ON-SITE WATER/SEWER5/2/20237/10/202304000000
33
3.1Soil & Perc Tests5/2/20237/3/2023036000OpenMedium00
34
3.2Septic System Design5/3/20237/4/2023036000OpenMedium00
35
3.3
Septic Permits, Inspections, Fees
5/4/20237/5/2023036000OpenMedium00
36
3.4
Septic System Installation, Tie in to House
5/7/20237/6/2023036000OpenMedium00
37
3.5Dewatering (High Water Table)5/7/20237/6/2023036000OpenMedium00
38
3.6
Well, Pump, Trenching, Plumbing to House
5/7/20237/6/2023036000OpenMedium00
39
3.7Well Permits & Fees5/8/20237/9/2023036000OpenMedium00
40
3.8Other5/9/20237/10/2023036000OpenMedium00
41
4UTILITIES5/11/20237/19/202304000000
42
4.1
Town Water: Tap Fees & Hookup
5/11/20237/12/2023036000OpenMedium00
43
4.2
Town Sewer: Tap Fees & Hookup
5/14/20237/13/2023036000OpenMedium00
44
4.3
Electrical: Permit, Connection Fee, Installation
5/14/20237/13/2023036000OpenMedium00
45
4.4
Gas: Permit, Connection Fee, Installation
5/14/20237/13/2023036000OpenMedium00
46
4.5LPN: Tank installation, Hookup5/15/20237/16/2023036000OpenMedium00
47
4.6Oil Tank Installation5/16/20237/17/2023036000OpenMedium00
48
4.7Telecom Hookup5/17/20237/18/2023036000OpenMedium00
49
4.8Other5/18/20237/19/2023036000OpenMedium00
50
5EXCAVATION & EARTHWORK5/21/20238/8/202304640000
51
5.1Cut & Fill5/21/20237/20/2023036000OpenMedium00
52
5.2Blasting5/21/20237/20/2023036000OpenMedium00
53
5.3Removal of Stone/Dirt5/22/20237/23/2023036000OpenMedium00
54
5.4Rough Grading5/23/20237/24/2023036000OpenMedium00
55
5.5Trenching For Utility Hookups5/24/20237/25/2023036000OpenMedium00
56
5.6Foundation Excavation5/25/20237/26/2023036000OpenMedium00
57
5.7Foundation Footing Drains5/28/20237/27/2023036000OpenMedium00
58
5.8Curtain Drains5/28/20237/27/2023036000OpenMedium00
59
5.9Culverts5/28/20237/27/2023036000OpenMedium00
60
5.10Swales5/29/20237/30/2023036000OpenMedium00
61
5.11Retaining Walls5/30/20237/31/2023036000OpenMedium00
62
5.12Ponds5/31/20238/1/2023036000OpenMedium00
63
5.13Other Site Drainage6/1/20238/2/2023036000OpenMedium00
64
5.14Backfill6/4/20238/3/2023036000OpenMedium00
65
5.15Compaction6/4/20238/3/2023036000OpenMedium00
66
5.16Top Soil6/4/20238/3/2023036000OpenMedium00
67
5.17Finish Grading6/5/20238/6/2023036000OpenMedium00
68
5.18Seeding/Sod6/6/20238/7/2023036000OpenMedium00
69
5.19Other6/7/20238/8/2023036000OpenMedium00
70
6FOUNDATION6/11/20238/27/202304480000
71
6.1Footings/Pads6/11/20238/10/2023036000OpenMedium00
72
6.2
Foundation walls/stem walls/grade beams
6/11/20238/10/2023036000OpenMedium00
73
6.3Piers6/11/20238/10/2023036000OpenMedium00
74
6.4
Slabs - Foundation, Basement, Garage
6/12/20238/13/2023036000OpenMedium00
75
6.5Steel Reinforcing6/13/20238/14/2023036000OpenMedium00
76
6.6Anchor Bolts, Hold Downs6/14/20238/15/2023036000OpenMedium00
77
6.7Buikheads6/15/20238/16/2023036000OpenMedium00
78
6.8Sub-Slab Vapor Barrier6/18/20238/17/2023036000OpenMedium00
79
6.9Sump Pump6/18/20238/17/2023036000OpenMedium00
80
6.10Crawlspace Vapor Barrier6/18/20238/17/2023036000OpenMedium00
81
6.11Crawlspace Vents6/19/20238/20/2023036000OpenMedium00
82
6.12Foundation Windows6/20/20238/21/2023036000OpenMedium00
83
6.13Damproofing, Water-proofing6/21/20238/22/2023036000OpenMedium00
84
6.14Foundation Drain Board6/22/20238/23/2023036000OpenMedium00
85
6.15Slab insulation: Edge/Blow6/25/20238/24/2023036000OpenMedium00
86
6.16Exterior Foundation Insulation6/25/20238/24/2023036000OpenMedium00
87
6.17
Exterior Insulation Coating/ Protection
6/25/20238/24/2023036000OpenMedium00
88
6.18Other6/26/20238/27/2023036000OpenMedium00
89
7OTHER MASONRY/PAVING6/28/20239/4/202303920000
90
7.1Patios6/28/20238/29/2023036000OpenMedium00
91
7.2Exterior Stairs6/29/20238/30/2023036000OpenMedium00
92
7.3Masonry Chimneys7/2/20238/31/2023036000OpenMedium00
93
7.4Fireplaces/Hearths7/2/20238/31/2023036000OpenMedium00
94
7.5Driveway7/2/20238/31/2023036000OpenMedium00
95
7.6Walkways7/3/20239/3/2023036000OpenMedium00
96
7.7Other7/4/20239/4/2023036000OpenMedium00
97
8ROUGH FRAMING7/6/20239/17/202304160000
98
8.1Sill & Seal7/6/20239/6/2023036000OpenMedium00
99
8.2
Steel/Wood Carrying Beam, Lolly Columns
7/9/20239/7/2023036000OpenMedium00
100
8.3Floor Framing7/9/20239/7/2023036000OpenMedium00