/templates/en/construction/construction-project-timeline-template
made with GanttPRO
- Total estimate
- ZONING
- HOUSE PLANS
- LOT SURVEY
- FINANCIAL - LOAN
- SEWER & WATER HOOKUP
- HEALTH PERMIT
- INSURANCE
- LOT CLOSING COSTS
- BUILDING PERMITS
- PRELIMINARY LIST ONLY
- BUILD PHASE
- SPECIAL & DRY IN MATERIALS
- WINDOWS/OPENINGS
- DEMOLITION
- LOT CLEARING
- DRIVEWAY, rough
- UTILITIES
- WELL or PUBLIC WATER
- SEPTIC or PUBLIC SEWER
- LAYOUT HOUSE FOOTPRINT
- DIG FOUNDATION
- ROCK PROBLEM
- PREPARE FOR FOOTINGS
- POUR FOOTINGS & PADS
- SET BRICK POINTS
- TERMITE TREATMENT
- RADON CONTROL
- FOUNDATION WALLS
- WATERPROOF FOUNDATION.
- COLUMNS/BEAMS SET
- UNDERGROUND PLUMBING
- BRICK/STONE, to finish grade
- GARAGE DOORS
- DRAIN TILE
- FIRE PLACE - INTERIOR
- PREPARE CONC. SLABS ETC.
- POUR CONCRETE-SLABS
- SPECIAL BACKING, BLOCKING
- BACK FILL, rough
- CHIMNEY, exterior
- FIRE SPRINKLER SYSTEM
- ROUGH-IN PLUMBING
- ROUGH-IN HEAT & A/C
- DECKS-PORCHES-RAILINGS
- ROOFING
- FASCIA & SOFFIT
- SHINGLES/FLASHING
- WOOD SIDING
- BRICK/STONE SIDING
- ROUGH-IN ELECTRIC
- INSULATION
- STAIRS
- EXTERIOR PAINT
- DRYWALL
- INTERIOR PAINT
- TRIM CARPENTRY
- CABINETS-VANITIES-TOPS
- GUTTER & DOWN SPOUT
- FINISH GRADING
- FINISH DRIVEWAY
- WALKS-DRIVEWAY APRON
- CERAMIC TILE
- ELEC-SWITCH/PLUG/PANEL
- LANDSCAPING
- LAWN SEEDING
- VINYL FLOORING
- CARPETING
- WOOD FLOORS-STAIRS
- APPLIANCES
- HEATING & A/C
- PLUMBING TRIM
- ELECTRICAL TRIM
- FINAL CLEAN
- WALK THROUGH
- FINISH PUNCH LIST
- Land Use
- Easements, Set Backs
- Access, Street Improvements
- Utilities Available
- Purchase Standard Plans
- Architect Original Drawings
- Specifications
- Architect Manage Job
- Engineer-Loads & Spans
- Draftsman
- House & Driveway
- Well Locaton
- Septic Location
- Fire Hydrant & Truck Access
- Plot Plan
- Land Cost
- Interest on Land
- Interest on Const. Loan
- Points, Etc.
- Fees
- Percolation Test
- Soils Engineer
- Fees
- Inspection Schedule
- Rough Hardware, Misc.
- Lolly Columns
- Steel Beams
- Rough Lumber, Trusses
- Windows, Grills, Screens
- Exterior Doors,Screens
- Skylights and Light Tubes
- Debris Removal & Clearing
- Dump Fee
- Bury Stumps, etc.
- Grade
- Base Rock, Culverts
- Temporary at startup
- Transfer to permanent
- Establish Finish Floor Height
- Set Back Distances
- Lay out and excavate
- Form, Rebar, Grade Pegs
- Yds. of Concrete
- Block/Course
- Piers
- Pour Wall, Yds. Of Concrete
- Lintels, Rebar
- Parging
- Cement, Sand, etc.
- Openers
- Trim, Backing, Weatherstrip
- Pour Hearth
- Firebox, or Set Prefab
- Brick or Stone Facing
- Gravel, Wire, Poly, Grade Stakes
- Labor to Prepare for Slab
- Rebar, Wire, form boards
- Labor-Prepare, Form other Conc.
- Deck & Post Hole footings, etc.
- Concrete
- Rebar, Wire, form boards
- Block, Flue
- Brick, Stone
- Prefab Fireplace & Piping
- Waste
- Water
- Ducts & Vents
- Bath Fans & Vents
- Kitchen Hood, Dryer Vent
- Stair, Railings, Pickets
- Gazebos, Pergola
- Squares of Roofing
- Squares Siding
- Squares rigid insulation
- Rake & Fascia
- Soffit, Vents
- Drip Edge, Flashing, Hardware
- Roof Paper, Siding Paper
- Tv, Stereo, Phone, Intercom
- Electric Wire, Boxes
- Vacuum, Misc.
- Security
- Crawl Space, Basement
- Ceilings
- Walls
- Attic, rafters
- Caulk-Windows, Doors, Etc.
- Firestuffing
- Treads & Risers
- Railing & Grasp
- Hang
- Tape
- Block & Skim Coats
- Sand
- Clean Up
- Stair Railings, Pickets
- Interior Doors
- Base
- Casing Trim
- Window Stool
- Closet Shelving
- Decorator Mouldings, Etc.
- Finish Hardware, Mirrors, Etc.
- Cabinets, Bath Vanities
- Kitchen Counter Tops
- Bath Vanity Tops
- Medicine Cabinets
- Stormwater Control
- Prepare
- Concrete
- Rebar, Wire, form boards
- Backer Board & Prep
- Tile & Grout
- Subfloor
- Square Yards of Vinyl
- Square yards of Pad
- Square Yards of Carpet
- Install
- Sand, Seal, Stain
- Finish Coat
- Purchase & Delivery
- Installation
- Install & Test Equipment
- Grills & Thermostat